Orthopedics department 2 – Hospital MALMÖ

Project Details

Category:
Corporate buildings

Location:
Sweden, Malmö

Year of construction:
2019

Types of works:
Locksmith

Systems:
Schüco

Type of glass:
Guardian Climaguard Premium

Surface area:
400 m2

Architect:
n/a

Locksmithing in the SHÜCO AW 75 SI system with RAMA3 insulating glass.
Magnetic drive blinds built into the glass.