Projects

FOUR SEASONS RESORT AND RESIDENCES ANGUILLA

THE SETTLEMENT FOR RELAXATION “VICEROY”,

today Four Seasons Resort and Residences Anguilla,

Caribbean Islands, Anguilla (2007/2008)
Type of work: Aluminum locksmithing ware of SCHUCO system whit insulation glass whit additional
wind protection.

Amount of work: 6.885.873,20 EUR

 

 

VILLA MODENA

VILLA MODENA (Main club House), Caribbean Islands Middle America, Anguilla (2007)
Type of work: Production and shipment of Aluminum locksmithing ware of SCHUCO ROYAL 65 system with tempered insulation glass with addition wind protection, Glass footing made from tempered glass whit RG ART design elements, Pictures application on glass.
Amount of work: 570.458,80 EUR

 

VILLA MODENA

BUTMIR d.o.o., Business and residential Building, Tower S2 A and C in Sarajevo

Year of construction 2014-2015,
Type of works: Aluminium glass facade, locksmith works, internal glass partitions
SYSTEM: SCHUCO  75 SI; FW50+, HANO RG OFFICE
Value of works: 1.4 Mio EUR.

 

Hotel Marriott


PROJECT DESCRIPTION:
The construction works on the new hotel licensed by the leading worldwide hotel operator began on 23 August 2013 in Sarajevo settlement Čobanija. With the 75 one-room and 20-two room apartments this hotel will offer a new concept of the hotel service in Sarajevo so called residence inn. The construction is to be finalized in October 2014 and the overall value of investment is 8 million €. 
The investor of this project is SEIC – South European Investment Company, consisting of some of the largest financial and real estate companies from the GC and the EU.
The modern architecture of the hotel will fully alter its current visual appearance. Having in mind that the usage of park in the vicinity of the construction site will not be possible for personal security reason the investor has undertaken all necessary measures to protect the green areas. In addition, the SEIC and committed to rearrange the park and provide it a new content once the construction works are finalized.
The control over planning and architecture of the project has been entrusted to Dušan Jovanović from the bureau ''Argentaria'' Sarajevo, while the first phase of construction works will be performed by one of the largest European construction companies Strabag.
HANO d.o.o got a contract for production and installation of entire façade for this building. 
 
 
 
 
 

Oki Dobrinja

PROJECT DESCRIPTION:

This residential complex is settled on a hill side zone next to the Olympic village “Dobrinja” in a new part of Sarajevo. Complex is composed of six residential buildings organized on one level underground perking with 100 lots. Each residential unit is designed in modules, that enables different use of residents from 60 sqm up to 180 sqm per unit depending on market demands. Main characteristic of architectural concept are large glass elements in each room and private use of inner court defined in- between buildings. 
Total value of this investment is 12 million €; investor and contractor OKI  d.o.o. Sarajevo Total preliminary, main, and detailed project has been already done by GRUPA ARH Sarajevo. 
 
HANO d.o.o got a contract for production and installation of entire façade for this building. Estimated date of the termination of façade work is the end of year 2014.
 

 

MBA Vogosca

HANO has just completed work on MBA Building in Vogošća.

Activity consisted of fabrication and installation of facade positions  in  FEAL Thermo 50 system as well as interior works manufacturing and assembling of RG wooden door with glass portals.
Project value 102.258,00 €

Hotel CARSIJA/Downtown

Work on the project -  Hotel CARSIJA/DOWNTOWN.

Work consi

sts of fabrication and installation of facade positions in SCHUCO FW50 + system.

as well as manufacture and installation of ventilated facades in Trespa Meteon panel. Panel is d = 8 mm, final finish - NW wooden decor, single-panel stained, matte structure.

 
 
 

Granoff

HANO has just completed work on Granoff building in Vogošcá.

Work consisted of fabrication and installation of facade positions in the system FEAL Thermo 50 System as well as production and assembly of doors in  RG system with GEZE Hardware.

Project value 87.000,00€ 

 
 

Residences and mosque in Poljine

Work on the installation of the facade residences and mosque in Poljine is in progress.

Facade system is SCHÜCO AWS / 65 Ads, ASS 50, 50NI.


Value of works 76.693,00 €

 

More Articles...

  1. Sarajevo City Center

Premium Joomla Templates
Premium Joomla Templates

Premium WordPress Themes
Premium WordPress Themes